Saturday, September 12, 2020

Things are coming together...

Well, everyone, I'm happy to report that progress on Carstenbahn One continues.  I added some more benchwork to widen the top station level.  This was done to provide enough room for the Vollmer 'Neuffen' station building.  I also painted the top of the station a light brown.  Here's how it looks with the station in place:


As you can see I also placed the signal tower in a provisional location.  Same goes for the freight depot:


Here is a view from the opposite end of the layout:


There are a few Preiserlings sitting on the loading dock of the freight shed in the station.  They are probably wondering when we might see a train...  

Well, as you can imagine, the answer was "very soon!"


The local passenger train made up of a V100 and three-axle 'Umbauwagen' has been waiting a few minutes for the arrival of the F-Zug, pulled by the beefy V200.  Meanwhile a pair of V36 diesels pulling a freight train wait at the signal at left for permission to ascend the grade up to the station.  

Next I will wire up the switches and remaining reed switches, and begin the programming of the layout... 

2 comments:

  1. So great to see all this progress and encouraging me to get back to my horribly undersized (H0) layout.

    ReplyDelete
    Replies
    1. Hey Peter, As much as I adore this scale I really can't recommend it. Would I go back to HO? Not likely, but there are certainly things I miss in HO, and more than once I have looked at the layout and thought, 'Wow, four tracks in the station, eh? In HO it could have been EIGHT...'

      Delete